Drilling a Water Well – Reference Video.net


G service. In this blog you’ll learn about the water well procedure and other things to know.

1. By using a drill bit

It’s a bit larger. It creates a slightly larger hole , so that the pipes and casings will slide downwards.

2. Metal Pipe

Water well drilling is made using steel pipe. The casing hangs over the soil to keep the groundwater out.

3. The removal of the First Drilling Head

The initial drill head has to be taken off.

4. Casing Placing

It is done to ensure that the groundwater will not enter the well.

5. Bentonite Clay

This can be used to coat and seal the casing. In dry form, it looks like gravel, but once the water is added to it the material, it expands.

6. Drilling Process

The moment the drilling process gets underway it is possible to hear the drill’s action of pounding. The drill rig spins, and crushes the rock and then pound it in about a foot.

7. Hit Groundwater

The groundwater may rise when the air is being pumped.

8. Finalization

After hitting the water, you are successful and the well is around 146m deep You can consider it an entire day. alhxcobc1m.